Façade inspections
Condition surveys, leak and water testing, troubleshooting and diagnosis of façade and glazing problems — on the ground and at height.


We specialise in the reactive repair and planned maintenance of glazed façades — windows, curtain wall, unitised façade and automatic doors — for the building's whole lifecycle.
Who we are
A specialist façade and building-envelope contractor working across London and nationwide.
We look after the whole life of a building's façade — inspection, design, supply, installation, planned maintenance and reactive repair. Our strength is high-level, complex work on occupied, landmark buildings: glass and curtain-wall replacement, cladding and metalwork, and automatic doors. We work on all the major glazing systems — Schüco, WICONA, Kawneer and Reynaers — so we can diagnose faults, source the right parts and carry out lasting repairs.
With years of hands-on experience delivering for Tier 1 clients, we support investors, owners, managers and contractors with practical solutions to avoid — or deal with — façade defects. A hands-on team whose directors and owners are involved day to day in the planning, management and delivery of every job.


What we do
Condition surveys, leak and water testing, troubleshooting and diagnosis of façade and glazing problems — on the ground and at height.
Glazed curtain wall, windows, unitised façade, cladding, doors and automatic doors — including mock-ups and test rigs for new build and retro-fit.
O&M and warranty reviews, scheduled inspections, cleaning, fire-door and compliance checks, budget forecasting and tendering of works.
24/7 call-out and rapid make-safe, high-level glass replacement, leak detection, and automatic-door troubleshooting, repair and replacement.
Whole-life service
Design and supply of façade systems, glass, cladding and doors from the architectural stage.
Mock-ups, test rigs and sign-off so the system performs exactly as specified.
Clean, service and inspect — preserving warranties and keeping the envelope watertight.
Planned upgrades and replacement as the building and its systems age.
Access & safety
We choose the safest, most efficient access method for each building and each task — always working to current Building Safety Act standards. No works start on site until the RAMS pack is approved and the team briefed.

Selected work
Described by type and location. Building names withheld under NDA.

High-level glazed-unit replacement and remediation of the building's access rig, on a fully occupied iconic City tower.

Cladding, soffit and fascia replacement and balcony roof waterproofing — fascia work by rope access. Principal Contractor; ~28 drops over ~40 weeks.

High-level glass replacement to an occupied residential tower, using a building maintenance unit and rope access.

Façade reinstatement works at a live sporting venue, sequenced around the match and event calendar.

Installation and replacement of large structural canopy glass over a busy public entrance beside a major transport hub.

Façade and glazing remediation to a high-value, heritage-sensitive building in a prime central London location.
Track record






Safety, quality & accreditations
Working in the UK demands a keen focus on safety — especially with larger clients. Our systems and supply chain are built for it. Download our certificates below.






Get in touch
Reactive repair, planned maintenance or a new project — message us on WhatsApp, call, or send a note and we'll come back quickly.